mukan-ibc/e2e/sample.config.yaml
Mukan Erkin Törük 6852832fe8
Some checks failed
CodeQL / Analyze (push) Waiting to run
Docker Build & Push Simapp (main) / docker-build (push) Waiting to run
golangci-lint / lint (push) Waiting to run
Tests / Code Coverage / build (amd64) (push) Waiting to run
Tests / Code Coverage / build (arm64) (push) Waiting to run
Tests / Code Coverage / unit-tests (map[additional-args:-tags="test_e2e" name:e2e path:./e2e]) (push) Waiting to run
Tests / Code Coverage / unit-tests (map[name:08-wasm path:./modules/light-clients/08-wasm]) (push) Waiting to run
Tests / Code Coverage / unit-tests (map[name:ibc-go path:.]) (push) Waiting to run
Deploy to GitHub Pages / Deploy to GitHub Pages (push) Has been cancelled
Buf-Push / push (push) Has been cancelled
initial: sovereign Mukan Network fork
2026-05-11 03:18:28 +03:00

8 lines
283 B
YAML

# This file contains a bare minimum configuration for running e2e tests.
# for a more detailed configuration, see sample.config.extended.yaml.
---
chains:
- tag: main # override with CHAIN_A_TAG
chainId: chainA-1
- tag: main # override with CHAIN_B_TAG
chainId: chainB-1