Some checks failed
CodeQL / Analyze (push) Waiting to run
Docker Build & Push Simapp (main) / docker-build (push) Waiting to run
golangci-lint / lint (push) Waiting to run
Tests / Code Coverage / build (amd64) (push) Waiting to run
Tests / Code Coverage / build (arm64) (push) Waiting to run
Tests / Code Coverage / unit-tests (map[additional-args:-tags="test_e2e" name:e2e path:./e2e]) (push) Waiting to run
Tests / Code Coverage / unit-tests (map[name:08-wasm path:./modules/light-clients/08-wasm]) (push) Waiting to run
Tests / Code Coverage / unit-tests (map[name:ibc-go path:.]) (push) Waiting to run
Deploy to GitHub Pages / Deploy to GitHub Pages (push) Has been cancelled
Buf-Push / push (push) Has been cancelled
2.4 KiB
2.4 KiB
Description
closes: #XXXX
Before we can merge this PR, please make sure that all the following items have been checked off. If any of the checklist items are not applicable, please leave them but write a little note why.
- Linked to GitHub issue with discussion and accepted design, OR link to spec that describes this work.
- Include changelog entry when appropriate (e.g. chores should be omitted from changelog).
- Wrote unit and integration tests if relevant.
- Updated documentation (
docs/) if anything is changed. - Added
godoccomments if relevant. - Self-reviewed
Files changedin the GitHub PR explorer. - Provide a conventional commit message to follow the repository standards.